Contact sales Nederlands
Installers unrolling a red PowerShield roll by hand along a cable trench Manual installation

Manual installation

Speed
3,000 m/h
Crew
2 people
  • Rolls that can be laid by hand: 0.4 × 100 m weighs 67 kg, 0.5 × 100 m weighs 84 kg
  • Unroll along the trench and connect with plug-in-hole fixings
  • Cut curves and lengths on site with a carpet knife
An excavator unrolling PowerShield into a trench Machine installation

Machine installation

Speed
8,000 m/h
Crew
1 person
  • Long rolls up to 200 m, for example 1 × 100 m at 170 kg
  • Load the roll into the equipment and unwind, red side up
  • Extremely well suited to plough installation

Step by step

From pallet to protected cable

  1. 01

    Delivered to the trench

    Rolls arrive on pallets, made to the exact width and length of your project. Nothing to return afterwards.

  2. 02

    Unroll over the cable

    Lay the roll by hand or unwind it from the machine, red side up, in one continuous run.

  3. 03

    Connect the rolls

    Join rolls with the plug-in-hole system. Overlap loss is around 0.1%, compared with 10% or more for plates.

  4. 04

    Cut to fit

    Follow curves and finish ends with a sharp carpet knife. Small parts can also be supplied.

Installation manual

The full manual, ready to print

The PowerShield installation manual covers every step, with photos: from preparing the ditch to connecting the rolls, for both manual and machine installation. Download it, or open and print it to take on site.

  1. Prepare the ditch: a uniform depth of 1 m, slightly wider than the roll (e.g. 1.2 – 1.5 m), with a level, well-compacted bottom
  2. Transport the roll on a metal spindle or bar through the centre of the core
  3. Manual installation: lower the roll centred into the ditch, unroll a few metres, load sand on the start and keep unrolling
  4. Machine installation: place the roll in the roll-off structure, red side up, and drive alongside the ditch
  5. Connect rolls: cut to size with a carpet knife, overlap, drill holes and connect with the pins supplied

PowerShield Installation Manual

PDF · 4 pages · 6 MB · version 21.10.2026

See it on site

A 100 m roll laid by a single machine operator.

Roll weights at a glance

Roll sizeWeightInstallation
0.4 × 100 m67 kgBy hand
0.5 × 100 m84 kgBy hand or machine
1 × 100 m170 kgMachine
Up to 1.36 × 200 mTailor madeMachine
Ask about roll sizes

Planning a cable project?

Tell us the trench length and width you need. We advise on roll sizes and installation method and send you a quote.

Contact sales